tracker
All repositories: gitoria
1.7 KB
# Mission 004 (old 045) — tracker.worldapi.org#10: installable app (PWA) + iconsTicket: `curl -s -H 'Accept: text/markdown' https://tickets.worldapi.org/api/projects/tracker.worldapi.org/tickets/10`Setup and rules as mission 002 (old 041) (`missions/002-tracker-my-pages.md`) — read it. App: loreana:/media/STORAGE/projects/tracker.worldapi.org.Reference implementation: loreana:/media/STORAGE/projects/calendar.worldapi.org (its README "PWA"/ticket #3 parts,project.hl `appIcons` / `offline`, icons/ folder). Do it the same way — hl:web generates manifest + service worker.## Build1. Icons: design a simple tracker icon (e.g. a play/check mark or a TV shape) in tracker green #4ec9b0 on the darkbackground rgb(25,30,35); SVG source + the PNG sizes calendar ships (incl. maskable + apple-touch), favicon.Hand-made SVG is fine; render the PNGs with a tool available on Loreana (rsvg-convert / ImageMagick / Chromescreenshot via cdp.mjs). Put them where calendar keeps its icons.2. project.hl: appTitle "tracker", appIcons, `offline = [...]` for the shell like calendar; theme colours from tokens.3. Offline: the shell (header + an "offline" message) opens without network; data pages simply need the network.4. Gate: manifest served and valid (name, icons exist and load, display standalone, start_url), service workerregisters, offline reload of `/` shows the shell (cdp.mjs has setOffline). All green with ports 8720–8731.5. LOOK at the icon at 48/192/512 px (screenshots or the PNGs themselves) and at a 390 px phone screenshot of the pagewith the new favicon/theme. Keep them in /tmp/w045/ on Loreana.6. README (step 10) + STATUS entry.## Report (short)Files, decisions (icon idea), gate command + last line, image paths, open points, Hybriel issues.
Branches
Latest commits
- 6c1936f9log+status: GC planmre
- 2846a840log: m569 result, GC hypothesismre
- b24cd2d5log: Anton on hl:fetch, mission 569mre
- 7d42cac1log+status: SL1 measured, fetch stalls remainmre
- 8e5f2ceflog: SL1 deployedmre
- 29f34212log: SL1 deploy startedmre
- 529dd741Merge sl1-slices: slice details repair and person fill (SL1)mre
- 8a83316blog: SL1 result, session drain slowermre
- 35e93e8dSL1: slice the details repair and person fill: catalog lists changed in place, 40 ms fill steps, people created in steps, writes one table per tickmre
- 72c9119flog+status: SL1 startedmre
- d74620fcmission SL1: slice repair and person fillmre
- 5d542d73log+status: ST1 resultmre
- 3945eb81ST1: stall diagnosis reportmre
- 404733aclog: ST1 startedmre
- 3e3d5a55mission ST1: stall diagnosismre
- 9c3180eblog+status: RV28d measured after deploymre
- fdf10b1alog: RV28d deployed on day38bmre
- 320005e9log: RV28d merged, deploy runningmre
- a8fef27dRV28d: reportmre
- 2bae8373RV28d: re-vendor Hybriel set day38b (source 1e554d75, bin 5ff2a46d)mre